Man power Supply
We are hereby feeling pleasure to introduce ourselves as manpower supplier.
A “BRIEF” spotlighting AGT guarantee selection of competent personnel according to the requirement of client, for which a module is developed incorporating job specifications and job description of manpower required for a practical project.
Mechanical Engineer
QA/QC Engineer
QA/QC Inspector
Instrument Technician
Supervisor
Forman
Welder(GTAW/SMAW/MIG/MIRROR)
Fabricator (Structural/Piping/Plate).
Pipe Fitter
Fitter
Grinder Man
Plumber
Electrician
Steel Fixer
Carpenter
Painter
Scaffolder
Rigger
Helper
SERVICES & Activities
Oil and Gas Services
Marine Services
Pipe Line Works
Heat Exchanger Fabrication & Eraction
Structural Fabrications & Eraction.
Wasel Fabrication
Storage Tanks (Fuel and Chemical).
Power and Desalination Plants
Structural Platforms.
Stack Boilers
Canopy and Cool Shade.
Steel and Aluminum Sheet Metal Works.
Handrails
Communication Towers.
Industrial Sheds.
Steel chimneys
Pressure Wesel
Manpower Supply Services
H.S.E PLAN
At Pak Atlantic Tech Group of companies, we have formulated an effective health safety and environment plan in line with industry practices. The copy of the H.S.E plan can be produced on request. The implementation of the same is in progress and as a policy matter the company is focusing on attaining the same in the current fiscal year itself.
As per our H.S.E plan safety aspects are exercised, on completion of the job. The laid out procedures are followed and project completion is recorded.
All the feed back documents and field experiences are analyzed thoroughly to add more authenticity for the future actions.
QUALITY SYSTEM AND POLICY
At Pak Atlantic Group Of Companies, we are developing our own quality system in the line with the supreme companies and are obsessed to implement quality assurance system to bring out company quality manual, at this juncture based on the nature of work, customer specification and considering the necessary industrial values.
We are strictly following the quality norms and incorporating project specific quality methods to our working environment to reduce the challenges faced to ensure the achievement of project deadlines.





